The pump house was carefully stripped back to its structural shell, with all defective roofing, linings and failed elements removed to expose and repair the original masonry. A new high-performance roof was then installed over upgraded structural supports, complete with insulation and durable external finishes, restoring the building as a dry, weather-tight and fully serviceable facility while retaining its industrial character.